- UID
- 390200
- 热情
- 1265
- 人气
- 1866
- 主题
- 99
- 帖子
- 758
- 精华
- 0
- 积分
- 2005
- 分享
- 0
- 记录
- 0
- 相册
- 1
- 好友
- 6
- 日志
- 0
- 在线时间
- 1121 小时
- 注册时间
- 2014-10-10
- 阅读权限
- 30
- 最后登录
- 2025-2-5
  
升级   0.33% - UID
- 390200
- 热情
- 1265
- 人气
- 1866
- 主题
- 99
- 帖子
- 758
- 精华
- 0
- 积分
- 2005
- 阅读权限
- 30
- 注册时间
- 2014-10-10
|
看到一个很中意的房子,但是看到LIM报告说这个房子存在Flood risk问题
This site is potentially at risk of flooding during heavy rainfall events.
The extent of this flooding is shown on the attached special land
features map as "Overland flowpath".
The overland flowpath has been determined after detailed hydraulic
analysis and/or modelling of the stormwater system and represents
the general overland route that stormwater may take.
The council may also hold a catchment or flood hazard report giving
detailed flood maps and flood levels in this area. These are held, and
available for viewing (for a fee), at 35 Graham Street, Auckland.
Any proposed development on this site may require a detailed flood
risk report to be completed by a qualified drainage engineer. This will
confirm the extent of risk and action required. Proposed development
must have regard for established flood flows and levels and the need
to ensure that flood plains and flow paths are not impeded.
求助各位大牛,这个房子能买么?
|
|