- We highly recommend sill flashings installed on all windows.
-We recommend the plasterer inspects the control joint between floors before painting.
-Have a top flashing installed across the outside power box.
- The cracked roof tiles will need to be replaced right away.(只有一个瓦片裂了,不是全屋)
会很贵吗?谢谢