- UID
- 280155
- 热情
- 102519
- 人气
- 126625
- 主题
- 1740
- 帖子
- 96446
- 精华
- 18
- 积分
- 164017
- 分享
- 0
- 记录
- 1
- 相册
- 1
- 好友
- 273
- 日志
- 0
- 在线时间
- 31617 小时
- 注册时间
- 2011-3-22
- 阅读权限
- 30
- 最后登录
- 2020-1-2
    
升级   0.01% - UID
- 280155
- 热情
- 102519
- 人气
- 126625
- 主题
- 1740
- 帖子
- 96446
- 精华
- 18
- 积分
- 164017
- 阅读权限
- 30
- 注册时间
- 2011-3-22
|
如果是$399.27, 好像是西区排污收费是统一的.
http://piha.co.nz/bestwest/2011/08/understanding-your-rates-bill/
First page
The transition rate is the GST exclusive total of $2433.73 minus the wastewater uniform charge of $382.08, which is a total of $2051.65. The 3.94% general increase is added to this, making a GST exclusive total of $2132.49.
Watercare has applied a general increase of 4.5% in their wastewater charges and therefore the wastewater rate has been shown separately. In this example, an additional 4.5% of $382.08 makes a GST exclusive total of $399.27. |
|